The Bluffs at Lake Lucy

Overview

The Bluffs at Lake Lucy development was originally part of the overall concept for The Park subdivision brought to the City by Lennar Corporation and received preliminary plat approval in March of 2019. The review process started in the summer of 2018 with a concept for a Planned Unit Development (PUD).  The PUD allowed for flexibility of lot size with the expectation of preservation of a significant amount of open space. The developer dedicated 50 acres for public park use around the perimeter of Lake Lucy. From the time of concept review in 2018 to preliminary plat approval in March of 2019, the subdivision went through a number of changes including: 

  • Decreasing the number of lots from 199 to 169
  • Increasing minimum lot size 
  • Eliminating the through street in the north portion (The Bluffs at Lake Lucy)
  • Creating a perimeter buffer between the development and the homes to the south 
  • Creation of tree preservation easements 

The preliminary plat has 4 phases. The 4th phase, now called The Bluffs at Lake Lucy, is being developed by Gonyea Company. Preliminary plat approval gives legal standing for the developer to proceed to final plat and all phases must meet the conditions of the preliminary plat. With the final plat, the city reviews the construction and landscaping plans to ensure they meet approved conditions.

Prior to the work starting on each phase, the city holds a preconstruction meeting with the contractor to review construction requirements and to  identify any extraordinary issues that may need to be highlighted. In addition, the City Forester walks the site with the contractor to ensure any trees noted for preservation are protected.

  1. Erik Henricksen

    Project Engineer
    Phone: (952) 227-1165

Notify Me Button

Click on the Notify Me button to sign up with your email and/or cell phone number to receive project updates. The information will be general in nature, such as proposed project schedule and upcoming construction activities. Contact Stacy at 952-227-1162 or by email for assistance.

1st Concept - August, 2018
The Planning Commission held a public hearing on the concept. The City Council reviewed the concept and based on public input, the street connection was eliminated from Galpin Boulevard to Lake Lucy Road. Additional changes were made resulting in the approved preliminary plat.The Park Concept - Rev

Approved Concept - North Portion - December, 2018

North_rendering_22x34

Approve Concept - South Portion - December, 2018

South_rendering_22x34

Approved Preliminary Plat - March, 2019

Project Schedule

City Forester Site Visit October 8, 2020
Grading 10/26/20; Anticipating 6 weeks to complete
Utilities Anticipating completion of sewer, water & streets by mid-July 2021
Pre-Construction Meeting November 5, 2020
Start Construction November 9, 2020
Substantial Completion TBD
Project Notification Disclaimer
Due to the variability of construction, updates typically do not include specific details such as day-to-day scheduled activity. The City's inspector or contractor will notify occupants directly if they will be impacted by a utility service shut down (example: water shutoff), or work (such as excavation or new curb) that will impede access to the property for a period of hours or days.