Approximately 0.4 miles of urban streets are proposed to be milled and overlaid within the Lone Cedar neighborhood located north of Highway 5 and east of Minnewashta Parkway. The project may include sanitary and storm sewer repairs and hydrant repairs.

Project Updates
September 26, 2016 - Sod and landscaping should take place today and tomorrow followed by paving, weather permitting.

September 12, 2016 - 
Sod and restoration is anticipated to happen later this week, pending weather conditions.  Paving will follow next week.

August 24, 2016
- Topsoil will go in this week followed by landscaping and sod next week, weather permitting. NOTE: Residents should make repairs to sprinkler systems and dog fences after the topsoil is placed but prior to sod installation by early next week (Monday or Tuesday).
Notify Me Button NEW! Click on the button to sign up with your email and/or cell phone number to receive project updates, i.e. emergency water shut off, neighborhood access issues, etc. or contact Jean at 952-227-1162 or by email for assistance.


Contact Us
Alyson Fauske
Assistant City Engineer
General Project Questions
(952) 227-1164 
Email

Danielle Washburn
Assistant Finance Director
Assessment Questions
(952) 227-1141 
Email

Steve Ferraro
Engineering Tech IV/
  Construction Manager
Construction Questions
(952) 227-1166
Email