Crane's Vineyard Ravine Stabilization Project

A small ravine exists off of Powers Boulevard within the Crane’s Vineyard subdivision. The ravine takes stormwater from the Curry Farms subdivision and drains into Christmas Lake. 

The ravine has significantly eroded in recent years and is building up a sediment delta within Christmas Lake. The overall goal of the project is to stabilize and improve the ravine, along with making access improvements for the City’s sanitary sewer line which exists adjacent to the ravine. 

The project is currently in the initial design phase.
The general project area is below in red.Crane's Vineyard Project Area

  1. Matt Unmacht

    Water Resources Coordinator
    Phone: (952) 227-1168

  2. Ryan Pinkalla

    Water Resources Technician
    Phone: (952) 227-1173